Concrete barrier/traffic signals installed on U.S. 14 retaining wall project in Shell Canyon

 

July 17, 2018



GREYBULL — A $1.8 million project to replace timber retaining walls with mechanically-stabilized earth (MSE) retaining walls is continuing on U.S. 14 through Shell Canyon.

“Concrete barrier and traffic signal systems have been installed for one-way traffic operations in Shell Canyon at mileposts 23.13 and 24.73,” according to Wyoming Department of Transportation resident engineer Michael Miller of...



For access to this article please sign in or subscribe.

 
X
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 04/24/2024 04:49